The question

We've had a few quotes from electricians to replace our two consumer units with one new board: 8 circuits, RCBOs, two AFDDs and surge protection, plus upgrading the meter tails to 25mm² and taking out a third old unit we don't use. Quotes ranged from £1,000 to £2,000, and most were around £1,200. Is £1,200 about right for this?

Based on a real question someone asked on a public forum, put in our own words with personal details left out. It isn’t an Ask Ballpark customer’s job.

About these perspectives: each one below is written by AI, looking at the question from one trade’s or specialist’s point of view. They aren’t real people, haven’t seen the job, and aren’t a survey or professional advice. The ballpark comes from Ask Ballpark’s own pricing, and every discussion is read by Ask Ballpark before it’s published.

Electrical perspective AI perspective

From an electrical point of view, a consumer unit replacement is notifiable work, so make sure each quote includes a full Electrical Installation Certificate, not just a minor works certificate. The building regulations view covers notification and sign-off.

  • Ask what happens if testing on the eight circuits finds faults. Old wiring that sat quietly on the old boards can trip RCBOs or AFDDs, and earthing or bonding upgrades are a common extra.
  • Check how the tails will be isolated. If there's no isolator switch and the supplier's fuse must be pulled, a distributor visit may be needed, which affects timing and cost.

Cost breakdown perspective AI perspective

From a cost breakdown point of view, the spread from £1,000 to £2,000 usually comes from what each quote leaves out. Ask each electrician to split materials (board brand, RCBOs, AFDDs, surge device) from labour, so you can see whether a cheaper quote uses a budget board or fewer protective devices.

  • Ask whether remedial work found during testing is priced, listed as a provisional sum, or left as an open extra. The electrical view covers what testing tends to turn up.
  • Check whether disposal of all three old units is included.

If any quote asks for a large deposit before work starts, get advice before paying it.

Building regulations perspective AI perspective

From a building regulations point of view, replacing consumer units is notifiable work under Part P, so the key question for each quote is who handles the sign-off. An electrician registered with a competent person scheme can self-certify and notify building control for you. One who isn't would need building control to inspect, which adds a fee and some delay, so check with building control or the electrician which route applies.

  • Ask each electrician which scheme they belong to, and check their registration on the scheme's own website.
  • Confirm the notification cost is included in the £1,200 rather than added later.
  • Expect two documents at the end: an Electrical Installation Certificate from the electrician, and a Building Regulations compliance certificate from the scheme a few weeks later. Keep both for when you sell.

General building perspective AI perspective

From a general building point of view, the electrics are only part of this job. Taking out two working boards and a third old one usually leaves screw holes, cable scars and unpainted patches where they were mounted, and new cable runs to a single board may need trunking or chasing. Ask each electrician whether filling, patching and any boxing-in are included, or whether you'll need a plasterer or decorator afterwards.

  • Expect most of a day without power. Plan around fridges, freezers, heating controls and home working.
  • Clear the space around the meter and boards beforehand, especially if they're in a cupboard or under the stairs.

The ballpark

Worked out by Ask Ballpark from the question alone, on 21 November 2026. A rough idea, not a quote.

  • Single board, basic £750–£1,100

    One new 8-circuit RCBO board with surge protection, merging two units, tested and certified.

  • Full job as described £950–£1,500

    New 8-circuit RCBO board, two AFDDs, surge protection, 25mm² meter tails, old third unit removed, certified.

  • Step up with extras £1,400–£2,000

    As described plus extra circuits or tidying up of old wiring, higher-spec board and making good.

Based on

  • Meter tail work needs no distributor visit
  • Existing circuits are in good condition
  • Standard mid-range board brand
  • Includes VAT, certification and removal of old units

Your quote of £1,200 is in the lower part of the ballpark for “Full job as described”. Worth asking the trade about a breakdown of labour and materials, and whether any remedial work found during testing is covered. If you’d like another price or two to compare, pick the option that’s closest.

Ask Ballpark’s summary

Your quote of £1,200 is in the lower part of the ballpark for "Full job as described" (£950–£1,500). The gap to the higher quotes is most likely down to what each one leaves out, such as remedial work, making good, certification, board brand and whether a distributor visit is needed. Ask for a breakdown and check what happens if testing finds problems, so you can compare like with like.

What we know

  • You want two consumer units replaced with one new 8-circuit board, with RCBOs, two AFDDs and surge protection.
  • Meter tails are to be upgraded to 25mm², and a third unused old unit removed.
  • You're in Kent and have had several quotes, from £1,000 to £2,000, with most around £1,200.
  • This is safety-critical, notifiable electrical work.

What we don’t know yet

  • Whether the existing circuits, earthing and bonding are sound, or need remedial work after testing.
  • Property size and type, and the number and type of existing circuits.
  • Whether the tails can be isolated without a distributor visit, and how long and accessible the run is.
  • Whether making good (filling, patching, decorating) is included.
  • Whether each quote includes the Electrical Installation Certificate and Building Regulations notification.
  • What each quote covers, split between materials and labour.

What would change the price

  • Faults found in testing, or earthing and bonding upgrades, would add cost.
  • A distributor visit to pull the supplier's fuse could add cost and delay.
  • Board brand and quality of the RCBOs, AFDDs and surge device would move the materials cost.
  • A long or awkward tails run, or new trunking or chasing for cables, would push the price up.
  • Making good, plastering or decorating, if not included, would be an extra.
  • An electrician who isn't in a competent person scheme would need building control to inspect, with a fee and delay.

Questions to ask the trade

  • Is a full Electrical Installation Certificate included, and the Building Regulations notification and its cost?
  • Which competent person scheme are you registered with?
  • Can you split the quote into materials (board brand, devices) and labour?
  • What happens, and what does it cost, if testing finds faults? Is that priced, provisional or an open extra?
  • How will the tails be isolated, and might a distributor visit be needed?
  • Is filling, patching and boxing-in included, and is disposal of all three old units included?
  • How long will the power be off?

What would yours cost?